Removed all planking for full frame inspection.Framing, planks & floor timber areas repaired / replaced include: master stateroom & master head, starboard guest stateroom & starboard guest head frame repair & planks, port aft bottom, engine room timber & framing replaced & re-planked, starboard galley to crew quarters bulkhead (7 sets), starboard frame / deck beam repair, lazarette frame & timber repair & water tank area, starboard frame / deck beam repaired, port frame, galley bulkhead; full-length frame repair chain locker / bow thruster, renew ceilings chain locker / bow thruster, renew ceilings chain locker / crew head area, crew galley, repair forefoot sides. Replace strut timber aft, 3-floor timbers master and lazarette, 6-floor timbers engine room bulkhead.
Bottom planked replaced, frame planks & floor timber repairs. 14-Spliced planks, butt blocks removed and replaced, butt joints reinforced, bow repair, upper stern repair, port hood end repair, bow plank repair (9) spliced. Remove and repair transom, refasten strut to transom. Remove epoxy in bottom seams, re-new caulking . Rudder blocks replaced.
• Engine room planking above ports replaced, galley stern closet planking replaced / repaired, shaft logs renewed.
• Starboard aft topside planks repaired, frame planking repaired
• Crew bilge deck beam repair, frame end repair, ceiling beam repair galley / engine room.
• Engine room ceiling / salon deck beams repaired / replaced.
Keel:
Bearding / keel checks for frame, keel repairs in midship, crew quarters, engine room area and bow. Outer keel repair (stern / keel) and keel top. Interior keel repair 10' section horn timber, and forward crew area 18' section horn timber. keel bolts removed and renewed. new worm shoe fixe. Deadwood stern keel repaired.
Deck Repairs:
Boat deck repair crew area outer deck, foredeck and sides. teak cap-rail repaired / replaced both port and starboard sides each in 16' sections; cap-rail repaired midships and stern, and aft deck cap rail. Starboard davit, accent battens and deck beams (side), aft deck teak accent trim, port and starboard waterfill areas, aft deck ceiling and beams. Fabricate lower tern bronze rub-rail, repair stem knee bolts. Re-fasten topside cabin house remove / renew water stained teak on house, rot damage repaired. Paint 14 port lights / 4 lids / 14 holes aft, paint davit plates / poles. Re-bed deck hardware, replace port light panel, port light outer rings painted. 6-Deck drains were replaced, port lights and port holes assembled and installed.
• Bilge clamp deck carlings and deck beams fabricated and fixed.
• 14-Round portholes repaired, rub-rail wood repaired, bow planking repaired port and starboard topsides.
• Gate handrails and forward port handrail repaired, forward gate cap rails repaired.
• Step plate and sand tread repaired
• Foredeck repair, crew hatch replaced
• Structural repairs to card room, pilothouse and pantry, card room day bed customized
• Stainless-steel rub rail replacement
• Port light boxes and covers
• New mast built
Exterior Miscellaneous:
• Full exterior paint including custom logo and gold leaf trim
• Teak doghouse repaired / rebuilt
• New deck furnishings including custom aft deck dining table and settee
• Hull painted and all teak varnished
Interior Restoration:
Floor timbers and framing removed and replaced as needed including master stateroom, aft strut timber removed, repaired, renewed or replaced, shaft log timber, crew quarters & crew galley, bow, crew bilge floor timbers, bow & holding tank area.
• Entire interior painted and varnished
• Custom shower pan fabricated for crew head
• Full interior painting and varnish including crew quarters, bilges
• Paint side and aft deck ceilings
• Custom replicated authentic Trumpy night stands port and starboard guest staterooms
• Custom mahogany lift-top desk
• Design and build master bed footboard custom TV box
• Custom television cabinet designed to blend with paneling and house a new 55" LG television with push-button "pop-up" controls in salon and integral to the footboard of the bed in the master stateroom.
• Salon TV panel repair, varnish / stain salon and deck, salon mantle for TV, grab rails for stairs, paint and replace hardware in closets.
• Guest stateroom floor timber repairs
• Vertical and horizontal salon panel seams
• Stern repair, build crew quarters port shower and closet
• Master stateroom inset panel, aft bulkhead repaired in master stateroom
• Re-frame guest hatches for new bunks
• New port guest head with shower
• New master shower
Varnish:
• All varnish interior and exterior stripped and re-varnished (varnished every year (last done 2025)
Mechanical:
• New bow thruster installed
• New fire suppression system in engine room
• New smart plugs for the shore power
• New watermaker 27-gallon per hour
• New water tank
• 2-Northern Light generators
• Fabrication of 40 genset bolts
• Strip and paint generator platform
• Galley & Butler's Pantry Totally Refurbished:
• Custom made US Cooler refrigerator and freezer with Sea Frost refrigeration systems
• New stove
• New sink
• New faucet
• New countertops
Crew Quarters:
• Fully painted and varnished
• Wood paneling replaced as needed
• Soles refinished
• New mattresses
• New washer and dryer