· Nonskid foredeck (8/2025)
· Rebuilt passerelle (8/2025)
· Engine room painted (8/2025)
· Complete ceramic hull and superstructure (8/2025)Generator Hydraulic Hose Maintenance: Replaced old and rusted hydraulic hoses. $6,380.20 (5/6/25)
· Main Engine 6000hr Service: $101,752.77 (4/9/25)
· Shipyard Period Updates: Includes bottom paint and Propspeed application on propellers and bow thruster. $86,011.02 (3/26/25)
· Tank Cleaning Service: Comprehensive cleaning of greywater, blackwater, and MSD systems.$5,538 (3/12/25)
· Bow Anchor Winch Rebuild: Complete hydraulic system overhaul. $7,400 (3/11/25)
· Steering System Maintenance: Replaced hydraulic hoses, cylinders, and over-center valve. $16,400 (3/11/25)
· Power Synchronization Correction: Improved power distribution and corrected synchronization issues. $7,860 (2/23/25)
2024
• HVAC System: Complete System Overhaul: Descaled chillers, serviced air handlers, replaced ducting, and addressed mold issues. $55,173.23 (11/23/24)
• Generator Overhaul: Extensive component replacements and system upgrades. $47,222.04 (11/15/24)
• Main Engine Battery Replacement: $10,920 (11/9/24)
• PTO Hose Replacement: Upgraded all hydraulic hoses to prevent leaks. $9,040 (8/23/24)
• Port Anchor Winch Rebuilt: Comprehensive hydraulic system rebuilt to address leaks and rust.$7,400 (8/13/24)
• Garage Seal Repair: Addressed leaks with new seals.$2,740 (8/13/24)
• Stainless Steel Pipe Fabrication for Main Engine: Enhanced resilience against rust. $520 (8/13/24)
• Sundeck Davits Repair: Maintenance on hydraulic cylinders and safety valve. $8,490 (7/30/24)
• Starboard Generator Injector Replacement: $7,147.60 (7/5/24)
• Garage Davits Service: Includes hydraulic cylinder repairs, safety valve replacement, and actuator service. $26,780 (6/27/24)
• New sofas in salon (May)
• New coffee tables in Salon (May)
• New dining room chairs (May)
• New True Freezer and refrigerators’ drawers in galley (May)
• Port and Stbd. exhaust leaks repaired (May)
• New gray water Bellow Pump (May)
• (2) New auxiliary cooling pumps for main engines (May)
• (2) New AC SeaWater pumps (May)
• Recertification of all fire equipment (May)
• Yearly Jamaican Flag survey (4/28/24)
• New switch gears for seamless transfer and Atlas
• (2) New PLC shore cord selectors
2022
· 4 new Jet skis (Nov)
· Replaced ceiling in control room and rebuilt shelving (Nov)
· All 3 crew showers rebuilt (Nov)
· Engineer’s cabin, head and shower rebuilt (Oct)
· Both water makers completely rebuilt (Oct)
· New headliner - entire vessel / $160,000 (July)
· New TV and Audio system / $130,000
· Ceramic coated Wax on entire vessel
2021
· New cathodic protection system
· New main engine exhaust from motor to the back of boat
· New generator exhaust
· All tanks professionally cleaned
· All raw water replaced, repaired, or serviced including sea chests, crossover, and all feed lines from crossover
· All air fuel vales serviced
· Air system flushed, and new air compressors installed with auto drains alarms and DC back up
· Rebuilt lazarette
· Atlas invertor on order to be replaced
· New engine room intake fans and dampers
· Starboard main engine overhaul at 6341 hours. Prior to present ownership
· New cell system with high-powered antennas and Kerio system
2020
· Port main engine rebuilt at 8951 hours. Prior to present ownership
· New water maker membranes
· New chiller plant and control system
· New raw water pumps
· New generator power system
· Bottom job and prop speed completed
· New master carpet
· New engine fuel heat exchangers, water pumps and fuel coolers
· New sat dish (V11)
· Full up to date engine, transmission, and generator service
· New engine room fire system and panel
· All air handlers replace with exception of sky lounge
· All cranes service and updated
· Replaced most of ac chiller lines
· All fuel values rebuilt
· New bottom paint, with prop speed
· All raw water replaced, repaired, or serviced including sea chests, crossover, and all feed lines from crossover
· Passerelle power pack removed, it is inoperative
2019
· New exhaust clean system
· New water maker system
· New customs beach club
· New motor mounts
· Shafts serviced, props balanced and cutlass bearings
· New customs beach club
2018
· Rebuilt hardtop – closed in
· Starboard transmission – Major service
· Sundeck new take decking
· Rebuilt electrical panels
· Shafts serviced and props balanced and brought to s-class
· New water maker system
· Annual maintenance & surveys carried out at Rybovich, Florida
· (3) New 10-ton chillers
· (43) New air handlers - every single one aboard was replaced
· New circulation line for air conditioning
· (2) New 99 kW Northern Lights generators
· Most of the yacht was rewired including all-new breaker panels
· New teak deck on sun deck
· Revamp of the hydraulic systems including new PTO’s
· Engine room was repainted and had a wrap added to walls and ceiling panels
· New hydraulics added to large forward Bosuns hatch
· New shaft seals
· All exterior cushions re-covered
· New spa controls
2015
· Annual maintenance & surveys carried out at Rybovich, Florida
· Haul-out, bottom paint, prop speed & zincs
· Stabilizers removed and new seals fitted (rams rebuilt in June)
· Thruster seals changed
· Rudders removed, bearings checked, seals replaced, and rams rebuilt
· All seawater inlet and overboard discharge valves replaced with new
· Fuel and water tanks opened and cleaned
· Sewage treatment system overhauled
· Electrical mega tests completed on generators and pumps
· 5-year hi fog factory service completed
Refit 2014
· An extensive refit was carried out in Ft. Lauderdale during the Summer of 2014 which included:
Exterior
· Complete repaint from mast to waterline
· Reconfiguration of sundeck to include a new bar area, larger table, and elimination of helm station
· Replacement of all old Corian countertops with new granite tops
· Upgrade of all exterior lighting to LED
Interior
· Complete re-decoration of the interior including all-new fabrics, upholstery, wall coverings, and furnishings
· Throughout the entire interior
· All new bedding and towels
· New ceilings and carpets in all areas
· Replacement of all stone countertops with new marble in all guest areas
· Modification of main salon bar area
· Installation of hardwood floor in the sky lounge
· Upgrade of all interior lighting to latest generation LEDs
· Extensive carpentry modifications and installations
Entertainment
· Complete overhaul of the AV system including new TVs and install of Crestron/iPad control system
· Upgrade of satellite TV systems
· Installation of 100” open-air movie projector system on the sundeck
Electronics
· Extensive rewiring and rearrangement of bridge equipment & Nema network
· Installation of new radar and depth sounder
· Installation of new Wi-Fi network through the yacht and new network control system
· Replacement of all radio and cell antennas
Engineering
· Top-end overhaul of main engines
· Full overhaul of transmissions
· Service work on generators
· Engine realignment
· Overhaul of watermakers
· New engine room and lazarette floor plates
· Extensive engine room painting and detailing