2025/2026:
All new electronics - 2026
New carpet throughout - 2026
(3) New CTM CW-60 Hz A/C Compressors - 60,000 BTUs each
New air handles
All new CTM A/C controls
New upholstered wall panels in Hallway and Guest Staterooms
All new TVs
2020/2024:
Bottom painted and Propspeed applied– October 2024
All new smoke detectors – January 2024
New house batteries – January 2024
(3) new bow thruster joy sticks– January 2024
New exhaust system by Design Engineered Solutions (D.E.S) – $130,000 upgrade - February 2023
New exhaust spray rings by D'Angelo Exhaust – February 2023
New non-skid on the Aft Deck – January 2023
All new fans and damper controls in Engine Room – January 2023
(2) new isolation transformers – January 2023
Fire equipment updated by Fireline
New steering lines
New galley air handlers
New and rebuilt engine monitors and shutdown systems
Cockpit and Swim Platform teak decks removed and replaced with non-skid decks
All new thru-hull sea valves
Stabilizers serviced
New steering hoses and steering pump seals
Engines and generators fully serviced
2019:
Port side Delta-T fan replaced
New sea power converter
Port engine injectors cleaned and serviced
Furuno F170 AIS System installed
2018:
New electric fuel pump for the main generator
New heat exchanger for the port generator
New tachometer installed on the starboard main engine
Port main engine plate cooler cleaned
Port stabilizer potentiometer replaced
Starboard batteries replaced
Starboard battery charger replaced by Tess Electric
Stainless-steel braided hose to the mixer gauges replaced
New turbo ring installed on the starboard main engine by Metcalf Marine
New compensator installed on the starboard exhaust in the crew area
New temperature switches installed in the fiberglass exhaust pipes in the crew area
Starboard crossover pipe and stainless-steel crush ring installed by Metcalf Marine
Both generator heat exchangers cleaned
Port auxiliary gear control plug replaced by Tess Marine Electric
Crew toilet macerator pump relay replaced
Crew macerator pump rebuilt
VIP toilet discharge line repaired
Starboard crossover pipe and mixer repaired
Turbo rings removed and refurbished
New thermostat installed in the crew area
Port crew bilge control box rebuilt
Bolts and gaskets replaced on both gearbox oil coolers
Starboard shore cord storage system control switch replaced
3” check valve replaced on the port main engine
Damaged cushion clamps replaced outboard of the port gearbox
New flush timer installed on the starboard guest toilet
Generator wood base replaced
Stabilizer hydraulic hoses replaced by Mendel Marine
Most steering system hoses replaced by Mendel Marine
Both main engine fuel coolers cleaned
Port main engine crossover removed by Metcalf Marine
New interior wall panels
New salon chairs and accent pillows
New davit motor
Davit repainted
Various fresh and raw water pumps replaced
Cockpit bilge tanks cleaned
Various paint touch-ups completed
Engine alignment performed
Propellers removed, balanced, and reinstalled
Shafts pulled, rebedded, and fitted with new shaft seals
Cockpit step halogen lighting converted to LED
Cockpit floodlight repaired
Cockpit grill lighting replaced with 230V bulbs
Shaft bearings replaced
Rudder bearings replaced
Fuel booster pump replaced on the starboard generator
Crew cabin bilge pump replaced
No. 1 Racor filter in the transfer system rebuilt
Engine room DC halogen lighting converted to LED
2017
Air-conditioning system serviced
New Shakespeare 390 SSB 23-foot antenna
New Shakespeare 5208-R VHF 23-foot antenna
New watermaker membranes
New water heater
New fire extinguishers and engine room fire suppression system
Partial interior refit in the main salon
Davit serviced and repaired
New stabilizer seals
New caulking around bridge windows
New bow hatches
New deck lighting throughout the main deck and cockpit
Engine room bilge tanks cleaned
Four (4) new 8D batteries installed on the port side
Port shore power converter rebuilt
Ballast replaced in the port inboard aft engine room fluorescent light
Engine room bilges professionally cleaned by MWM
Tender davit rebuilt by Signature Marine
Spray rail repairs completed
Crew quarters steps rebuilt
Battery condition meter replaced on Distribution Panel No. 2
2012
USD 1.6 million in upgrades, including:
New generators
Rebuilt engines
Vessel painted from waterline up
New interior
New appliances