2025/2026
● Boat Deck Teak Replaced
● TVRO’s and VSAT domes removed and mast modified for One Web antenna
● Replacement of Sky Lounge Silk Panels
2024/2025
● Sundeck Teak recaulking
● Main engine checks- Turbos, cooler rebuilds, Thermostats replaced. Various gaskets and oil leak prevention.
● Generator 2000-hour servicing by authorized dealer
● AMS complete monitoring system upgrade to Bluewave V.3
● Crew mess: Replacement of Miele dishwasher
● Full deck crane 10-year overhauls: x2 boat deck crane. X1 foredeck crane
● Passerelle overhaul
● Galley pot washer replacement
● Propeller shaft aft oil seal replacements
● Deck winches/windlass overhauls
● HEM water maker overhauls’ pump rebuilds. Membrane replacements
● Master Cabin Carpet Replacement
2023/2024
● Main Deck Aft Teak recaulking
● Complete replacement custom-built air-conditioning plant installed in engine room 540,000 BTU.
● All interior air con fan coils replaced, and heating elements installed for local heat control
● Steering system- Hydraulic Rams overhauls. hydraulic hose replacements
● Crew Area refurbishment
2022/2023
● Swim Platform Teak recaulking
● Generator 2000-hour servicing by authorized dealer
● Stabiliser system: 8000-hour full overhaul
● Laundry- Replacement of x6 Miele washers/driers
● Propeller shaft aft oil seal replacements- Akerboom
● Bow thruster overhaul
● Fresh water tanks: full sandblast and re-paint. Welding repairs.
2021/2022
● Main Engine works- Front and rear crankshaft seals replaced. Cooler rebuilds. Cooling pump rebuilds
● Main engine port engine fuel pump drive rebuilt
● Bow hull plating replacements. Complete new bow thruster tunnel installed
● Special survey (5 yearly) inspection- ABS incl hull survey
● All hull valves overhauled
2020/2021
● Generator 10,000-hour top end overhaul and servicing- Recon cylinder heads installed
Crankshaft seals replaced rear and front. Alternator inspections.
● Galley steam ovens complete x2 replaced- Salvis 611T installed. Induction hob replaced. All Salvis galley equipment inspected.
● Foredeck hatch replacement. Teak replacements foredeck
● Emergency steering system- hand wheel and pump installed lazerette
2019/2020
● Full Paint job
2018/2019
● Main engine alignment checks and vibration analysis. Vulkan Drive coupling replacements.
● Reintjes main propulsion gearboxes: complete overhaul by authorized dealer
● Stabiliser system: 8000-hour full overhaul
● Lazerette ice machine replacement
2017/2018
● Main engine works- Cylinder heads removed and all head gaskets replaced. Governer overhauls. High pressure fuel pump overhauls. Cooler rebuilds. Cooling pumps overhauls.
● Generator 2000-hour servicing by authorized dealer
2016/2017
● Sky lounge full interior rebuild and structural repairs
● Port side lower guest cabin x2 strip out and rebuilds
● Steering system full overhaul power packs and rams- Wills Ridley
● Propeller shaft aft seal replacements
2015/2016
● Generators 4000-hour servicing. Coolers, turbos, injection pumps, cooling pumps overhauls.
● Propeller shaft intermediate shafts removed and inner oil lip seals replaced
● Fuel tank monitoring sensors complete replacements
2014/2015
Rebuild Phase 3
● Complete rebuild of the bridge, master stateroom and sundeck.
● Complete new mast with all comms/antennas installed.
● Circular 8 person Jacuzzi and surround seating installed on sundeck.
● Complete new AVIT system installed throughout the vessel.
● Replacement 5-blade fixed pitch propellers installed.
● Hull and superstructure paint works completed.
2013/2014
Rebuild Phase 2
● Completed rebuild of all 8 guest staterooms.
● Extensive engine room and equipment refit including complete replacement Northern Lights M1066H generator x 2.
● Main switchboard and vessel power distribution replacement including complete rewire
of vessel.
● Replacement shore power convertors installed.
● Complete replacement Zero Speed Quantum stabilizer system.
● HEM Reverse Osmosis plant installed with 20,000 liters per day production capacity.
● Engine room sound insulation upgrade.
● Complete new vessel SIMON monitoring system installed.
● Replacement foredeck Opacmare jet ski lifting crane installed.
● Complete replacement Frigomar air conditioning chilled water system installed throughout vessel including room fan coils.
● Replacement stainless steel clad walk-in
● fridge and freezer cabinets complete installed.
● Galley equipment refit including replacement steam ovens, induction hob, Salamander and fryer.
● Main engine inspections- Main and big end bearings inspected.Turbos, coolers, injectors, oil pumps, cooling pumps rebuilds.
● Main engine compression testing
2012/2013
First works under the current Owner consisted of complete rebuild in 3 phases.
Rebuild Phase 1
● Complete rebuild of:
o Crew Area
o Skylounge
o Main Saloon and Dining Area
o Guest Lobby
o Upper and Lower Dayheads
Winter 2008/2009
● Completely new air conditioning system throughout the yacht.
● New larger Jacuzzi with 15 sqm. sunbed for top deck.
● New independent Bose entertainment system in all guest staterooms.
● 2012/2013
● Extensive refit of sky lounge and main salon/dining.
2006/2007
● Complete refit at Pendennis Shipyard.
● Stern extension with air-conditioned guest lazarette and dayhead.
● Complete new main deck (salon, day head, VIP and Master stateroom) and skylounge with outdoor cinema.
● All guest bathrooms with new fabrics, fillings, floorings and AV.
● New interior floors on every deck. Aft deck 50% new teak and Bridge completely new teak and furnishing.
● New bar on aft deck. New spiral staircase from aft deck to bridge deck.
● VSAT with Wi-Fi throughout the yacht, Sonos sound system and outdoor cinema on skylounge.
● Complete Caterpillar main engine and generator rebuilds.
● Completely new CCTV system throughout.
● Complete hull overhaul with completely new paint job of the whole yacht .
● Upgraded to MCA standards.