• Main engine and generators were completely refitted
• -18 +4 kitchen cabinets and sea water pumps were renewed
• Air conditioning sea water pumps were renewed
• Watermaker seawater pumps were renewed
• Maintenance of watermakers was performed
• Electrical panel was renewed
• Some of the hydraulic circuits were renewed
• A new tunnel was opened at the stern and a propeller was installed
• Local putty on the boat side was renewed
• The boat side and living quarters were completely painted
• Fuse of the electrical panel in the engine room was renewed
• 3 x TVs were purchased for the lounge
• A TV unit + library + TV set was made for the lounge
• Lounge seating group was renewed
• Lounge was equipped with accessories
• All cabin air conditioning fan systems were renewed
• Air conditioning unit sea water circulation system was renewed
• Satellite and internet system on the boat was renewed
• Sound and music systems were updated
• Kitchen equipment was renewed
• BBQ equipment was added
• Refrigerator in the kitchen was renewed
• Kitchen floor was renewed
• Staff cabins were completely renewed
• Water installation, electrical and fire systems were overhauled
• Maintenance of starboard and port sea entry stairs was performed
• All sails were removed, washed, and hardware controls were performed
• Deck sail lantern maintenance was performed
• The steel part that joins the wood at the bar was completely primed, puttied, and painted
• The bar at the stern was renewed
• Shafts and propellers were removed and balanced
• Anchors and their pockets were filled and polished
• 1 x 500 gal watermaker was added
• All chromes on the boat were polished
• Deck caulking was partially renewed
• 3 x Main masts local paint was performed
• Lighting on the boat ceilings was renewed
• -18 +4 kitchen refrigerator doors were renewed
• 1 x New ice maker was added to the system
• Maintenance of rudder pistons was performed
• Bow propeller was removed and maintenance repair was performed
• Windlass maintenance was performed
• 50 meters each were added to the anchor chains for starboard and port
• All sail ropes were subjected to a complete strength test, cleaned, and re-installed
• Service and generator main engine batteries were checked
• Boat door handles were completely renewed
• Boat TV satellites were painted and their maintenance was performed
• LED lighting was added to the boat
• Gaps in the mast wires were taken
• Chrome sheath was made to the mast wire tension lifts
• Mast gaff deck lighting was renewed and upper lighting was renewed
• Extractor stove fans in the kitchen were renewed
• Chrome shelves were made to the kitchen
• Fire systems were completely overhauled
• Generator coil winding and electrical system maintenance were performed
• Boat personnel's handheld radios were completely renewed
• Boat curtains were completely renewed
• Engine room valves were renewed
• Temperature and pressure system was made to the main engine start panel
• Boat exterior scupper caulking was completely renewed
• Corian countertops on the boat were sanded and overhauled
• Staff bathroom and water installations were renewed
• Tik grills were made to staff bathrooms and all cabins
• Main engine and generators were completely painted
• A complete new varnish was applied to the kitchen
• Door glasses of the pool in the stern area were changed
• Deck lighting LEDs were changed
• Lifebuoys were changed
• 2 x Projectors were mounted to the stern of the boat
• Clothes dryer was renewed
• A vertical refrigerator was purchased for the kitchen
• A portable BBQ was purchased for the kitchen
• Air curtain panel was purchased for the kitchen door
• A dishwasher was purchased for the kitchen
• Shelf system and floor chrome coating were made to the large cabinet interiors
• Kitchen and bridge top ceilings were renewed
• A DJ music set was purchased
• A glass washing machine was purchased for the bar in the stern area
• Internet system on the boat was renewed
• Deck teaks were sanded
• Bow propeller gears were renewed
• Water pressure system was renewed
• TV elevator was installed to the pool in the stern area
• Complete maintenance was performed on 4 fire hydrant pumps
• A sunbathing chapel was made to the flybridge
• Railing varnishes were renewed
• Stern master was renewed
• A reciprocal opening and closing was made to the stern master scupper, one each for starboard and port
• Maintenance was performed on the stern passerelle
• Water and electricity systems were moved to the flybridge
• Maintenance was performed on the boat cabin system
• The floor of the kitchen exit corridor captain cabin was renewed
• A bar was made to the flybridge, cabinet and ice maker were added
• 2 x Seating groups were added to the flybridge
• Main engine non-flammable mats were renewed
• Port water outlet chrome couplings were removed, polished, and mounted
• The 3 booms of the sail mast were removed. Putty and paint were applied and they were reassembled
• The port cover of the midship was removed, and maintained, and its teaks were changed and mounted
• The teaks on the deck were partially replaced
• 3 x PLC screens were calibrated and placed for manual tank indicators to be on the flybridge machine bilge floor
• The midship starboard port shower system was renewed